Pre-Wiring Summary (CCTV + Intercom)

Including: PoE switch needs a GPO + data point to modem


πŸ”Ή IP CCTV Pre-Wiring Requirements

Cables:

  • 1 Γ— CAT6 from each camera β†’ back to NVR or PoE switch (home-run topology).

Recorder/NVR Location Needs:

  • 1 Γ— Double GPO (NVR + spare)

  • 1 Γ— Data point (RJ45) to modem/router (for remote viewing)

PoE Switch (if separate from NVR):

  • 1 Γ— GPO (power point)

  • 1 Γ— Data point to modem/router (uplink)


πŸ”Ή IP Intercom Pre-Wiring Requirements

Door Station(s):

  • 1 Γ— CAT6 back to the PoE switch

Indoor Monitor(s):

  • 1 Γ— CAT6 back to the PoE switch

  • Usually PoE powered (no local power point needed)

PoE Switch Requirements (Intercom):

  • 1 Γ— GPO (power point) for the PoE switch

  • 1 Γ— Data point (RJ45) back to the modem/router

  • Enough PoE ports for all devices


πŸ”Ή Builder-Friendly One-Liner Summary

CCTV

  • CAT6 from each camera β†’ recorder/switch

  • NVR: double GPO + data point

Intercom

  • CAT6 from each door station & indoor monitor β†’ PoE switch

  • PoE switch: GPO + data point to modem

 

==================================

 

πŸ“Œ Pre-Wiring Requirements – Bosch Alarm System

Assuming: Keypads, Internal Siren, External Siren/Strobe, PIRs, Reed Switches


πŸ”Ή 1. PIR Motion Sensors

Cable:

  • 1 Γ— 6-core security cable (stranded, 0.5 mm) from each PIR β†’ alarm panel location.

Notes:

  • 4 cores required (12V+, GND, Zone, Tamper), extra 2 cores for redundancy.

  • Mount PIRs at 2.2–2.4 m height.

  • Avoid pointing directly at windows or heat sources.


πŸ”Ή 2. Reed Switches (Doors/Windows)

Cable:

  • 1 Γ— 4-core security cable from each reed β†’ panel (or a junction loop).

Notes:

  • 2 cores for the switch, 2 for tamper or future use.

  • Drill into the hinge side of the door frame when possible.


πŸ”Ή 3. Keypads (Bosch LCD / Icon / Touchscreen)

Cable:

  • 1 Γ— 6-core security cable from keypad β†’ alarm panel location.

Location Requirements:

  • Mount at light switch height near main entry.

  • If using the Bosch touch keypad: a GPO nearby is optional (some touch models use 12V only, but safe to allow a GPO if unsure).


πŸ”Ή 4. Internal Siren

Cable:

  • 1 Γ— 4-core security cable from panel β†’ internal siren location.

Notes:

  • Mount high in the hallway or central area.

  • Usually wired as +12V, GND, SIREN+, SIREN–.


πŸ”Ή 5. External Siren / Strobe

Cable:

  • 2 Γ— 4-core cables from alarm panel β†’ external siren box.

    • Cable A: Siren connections

    • Cable B: Strobe / tamper / backup battery monitoring

Location Notes:

  • Mount high and visible.

  • Allow good accessibility for future service.


πŸ”Ή 6. Alarm Control Panel Location

Panel Requirements:

  • 1 Γ— GPO (for the Bosch plug-pack power supply)

  • 1 Γ— Data point (RJ45) optional but recommended if integrating with IP modules (B426, B450, cloud apps).

Cabling:

  • All device cables (PIRs, reeds, keypad, sirens) should terminate at the panel.

Location Tips:

  • Garage, linen cupboard or comms cupboard is ideal.

  • Avoid hot roof spaces.